求翻译:In order to reduce the number of towers, Vendor is requested to study a possible relocation of the coal sampling. This system has to be installed, in any case, after the crusher and after the metal removal. A possible solution is to install the sampling system inside the tower 00UEF50 if this is not cause of a tower di是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In order to reduce the number of towers, Vendor is requested to study a possible relocation of the coal sampling. This system has to be installed, in any case, after the crusher and after the metal removal. A possible solution is to install the sampling system inside the tower 00UEF50 if this is not cause of a tower di
问题补充:

  • 匿名
2013-05-23 12:21:38
为了减少塔的数量,卖方要求,研究煤采样的可能搬迁。
  • 匿名
2013-05-23 12:23:18
为了减少塔的数量,供营商请求学习煤炭采样的可能的拆迁。这个系统必须被安装,无论如何,在压碎器以后和在金属撤除以后。如果这不是塔维度增加的原因可能解决方案将安装在塔00UEF50里面的采样系统。
  • 匿名
2013-05-23 12:24:58
为了减少塔的数量,供营商请求学习煤炭采样的可能的拆迁。 这个系统必须安装,无论如何,在压碎器以后和在金属撤除以后。 如果这不是塔维度增加的起因可能解决方案将安装采样系统在塔00UEF50里面。
  • 匿名
2013-05-23 12:26:38
为了降低塔的数量,请供应商研究煤取样可能搬迁。此系统已安装,在任何情况下,破碎机和后金属去除。一个可能的解决方案是安装内塔 00UEF50 的采样系统,如果这不是塔尺寸增加的原因。
  • 匿名
2013-05-23 12:28:18
要减少塔数量,供应商被请求学习煤炭采样的可能的重新安置。这个系统必须安装,无论如何,在金属删除之后和在压榨机之后。可能的解决方案是安装在塔 00UEF50 中的采样系统如果这不是增加的塔尺寸的原因。
 
 