当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The existing construction cost management system in China was formulated in 1950s, and improved in 1980s. Traditional construction cost managerial approach was one method brought in from the former Soviet Union based on unified quota of the country. It is characterized by the managerial approach of construction cost in是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The existing construction cost management system in China was formulated in 1950s, and improved in 1980s. Traditional construction cost managerial approach was one method brought in from the former Soviet Union based on unified quota of the country. It is characterized by the managerial approach of construction cost in
问题补充:

  • 匿名
2013-05-23 12:21:38
在中国现行的工程造价管理体系制定于20世纪50年代,并在20世纪80年代得到改善。
  • 匿名
2013-05-23 12:23:18
现有的造价管理系统在中国在20世纪50年代之内被公式化了,并且在20世纪80年代之内被改进了。传统造价管理方法是从前苏联带来的一个方法根据国家的统一的配额。它描绘为造价管理方法在计划经济的,确定它不可能适应当前市场经济的要求。
  • 匿名
2013-05-23 12:24:58
现有的建筑费管理系统在中国在50年代之内被公式化了,并且在80年代之内被改进了。 传统建筑费管理方法是从前苏联带来的一个方法根据国家的统一的配额。 它在计划经济描绘为建筑费管理方法,确定它不可能适应当前市场经济的要求。
  • 匿名
2013-05-23 12:26:38
在中国现有的施工成本管理体系是在 20 世纪 50 年代,制定和完善了 20 世纪 80 年代。传统的施工成本管理的方法是国家的从基于统一定额前苏联引进的一种方法。它是在计划经济条件下,它决定了它不能适应当前市场经济要求的工程造价管理方法的特点。
  • 匿名
2013-05-23 12:28:18
在中国的现有建造成本管理系统在二十世纪五十年代被阐明,在二十世纪八十年代改善。传统建造费用管理方法是从根据国家的成一体的定额的前苏联被带来的一种方法。在计划经济中被建造费用的管理方法描绘,决定它不能适应现有市场经济的要求。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭