当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Abstract: Jude river power plant on the areas under the jurisdiction of the power station in addition to the children of judah on the river, and in jiangxi GongJiang basin development to build two hydroelectric plant, acquired leave gold dam hydropower station in jiangxi ruijin county. This article mainly aims at the a是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Abstract: Jude river power plant on the areas under the jurisdiction of the power station in addition to the children of judah on the river, and in jiangxi GongJiang basin development to build two hydroelectric plant, acquired leave gold dam hydropower station in jiangxi ruijin county. This article mainly aims at the a
问题补充:

  • 匿名
2013-05-23 12:21:38
摘要:犹江电厂的电站除犹在河的孩子管辖的领域,并在江西GongJiang流域开发建设两个水力发电厂,收购了假金坝水电站在江西瑞金县。
  • 匿名
2013-05-23 12:23:18
摘要:茱迪河区域的能源厂在发电站的司法下除judah的孩子的之外在河和在江西GongJiang修造两水力发电厂的盆地发展,获取的事假金水坝水力发电驻地在江西瑞金县。
  • 匿名
2013-05-23 12:24:58
摘要: Jude河能源厂在区域在发电站的司法之下除judah的孩子之外在河和在江西GongJiang修造二水力发电厂的盆地发展,获取的事假金水坝水力发电驻地在江西ruijin县。 这篇文章主要瞄准植物的区域将是四水力发电驻地建筑遥远的集中化控制系统,并且探索水库小组水力发电驻地,中央控制优化预定,最大化水库为派遣效率的防洪和电力发动。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭