求翻译:Resource Allocation – The main job of the fabricator is to make sure that the shop has the appropriate skilled tradesmen, tools, plant, and space available for the construction and assembly of the project equipment. Decisions are often made due to a shortage of one resource and a surplus of another. The sooner problems是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Resource Allocation – The main job of the fabricator is to make sure that the shop has the appropriate skilled tradesmen, tools, plant, and space available for the construction and assembly of the project equipment. Decisions are often made due to a shortage of one resource and a surplus of another. The sooner problems
问题补充:

  • 匿名
2013-05-23 12:21:38
资源分配 - 加工商的主要工作是确保店内有相应技能的技工,工具,厂房和空间可为项目提供的设备的建造和装配。
  • 匿名
2013-05-23 12:23:18
资源分配–编造者的主要工作是确信,商店有适当的熟练的匠人,工具,植物和间隔可利用项目设备的建筑和装配的。决定经常做出由于一种资源短缺和别的节余。问题快察觉并且涉及,机会的那里是对整体上项目进度的冲击。
  • 匿名
2013-05-23 12:24:58
资源分配-编造者的主要工作是确信,商店有适当的熟练的匠人,工具,植物和间隔可利用为项目设备的建筑和装配。 决定经常做出由于一种资源短缺和另的节余。 整体上问题快察觉并且涉及,机会的那里是对项目日程表的冲击。
  • 匿名
2013-05-23 12:26:38
资源配置 — — 的加工商的主要工作是,确保商店具有适当技能的商人、 工具、 植物、 和的建造和装配项目设备的可用空间。决策往往是一个资源的短缺和过剩的另一种。越快越问题是发现并处理的对作为一个整体项目进度的影响存在的机会就越少。
  • 匿名
2013-05-23 12:28:18
资源分配 - 造假者的主要工作是确保商店有适当熟练的商人,工具,植物,空间可供项目设备的建造和组装。决定经常由于一种资源和另外的盈余的缺乏被做出。更很快问题被认出和打击具,在那里总体上是对项目时间表的一种影响的更少机会。
 
 