当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before beginning the design and production of the machine, and at the latest 4 weeks after the contract award, a meeting must be held to dis- cuss the mechanical and electrical component of the project-specific specification. At this meeting, the supplier will present us with a detailed schedule for the project.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before beginning the design and production of the machine, and at the latest 4 weeks after the contract award, a meeting must be held to dis- cuss the mechanical and electrical component of the project-specific specification. At this meeting, the supplier will present us with a detailed schedule for the project.
问题补充:

  • 匿名
2013-05-23 12:21:38
在开始设计和生产的机器,并在最近4周的合同授予后,会议必须持有该项目的具体规格显示坏话的机械和电气元件。
  • 匿名
2013-05-23 12:23:18
在开始机器的设计和生产和在发包以后的最迟4个星期,必须召开会议到dis-前咒骂项目具体规格的机械和电动元件。在这次会议上,供应商将提出我们与项目的详细的日程表。
  • 匿名
2013-05-23 12:24:58
在开始机器的设计和生产和在最新信息4个星期,在必须拿着合同奖,会议对dis-之后之前咒骂项目具体规格的机械和电动元件。 At this meeting, the supplier will present us with a detailed schedule for the project.
  • 匿名
2013-05-23 12:26:38
在开始之前的设计和生产的机器,并在最新的 4 个星期后授予合同,会议必须举行讨论特定于项目的规格的机械和电气组件。在这次会议上,供应商将会给我们详细的时间表,该项目。
  • 匿名
2013-05-23 12:28:18
在开始机器的设计和产量之前,最迟在合同奖后 4 星期,一个会议必须被紧紧抓住 dis- 诅咒项目特定的规格的机械和电组件。在这个会议,供应商为项目以一份详细时间表将赠送我们。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭