当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The area to be used behind the dock is formed into land by filling in the sand dredged from the channel in the harbor basin. Meanwhile, in order to avoid the influence of the late foundation treatment on the land at the early stage as far as possible, the sand filling scope is extended outwardly by 10m and the boundary是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The area to be used behind the dock is formed into land by filling in the sand dredged from the channel in the harbor basin. Meanwhile, in order to avoid the influence of the late foundation treatment on the land at the early stage as far as possible, the sand filling scope is extended outwardly by 10m and the boundary
问题补充:

  • 匿名
2013-05-23 12:21:38
要使用的码头后面的区域是通过填充从港池的疏浚渠道沙子形成的土地。
  • 匿名
2013-05-23 12:23:18
在船坞后将使用的区域被形成入土地通过填装在被清疏的沙子从在港口水池的渠道。同时,为了避免晚基础治疗的影响对土地在早期尽可能的,沙子填装的范围由10m扩大向外,并且界限通过分级法和分级被稳定。关于用于这期间的区域,不是受基础治疗支配
  • 匿名
2013-05-23 12:24:58
在船坞之后将使用的区域在港口水池被形成入土地通过填装在被清疏的沙子从渠道。 同时,为了避免晚基础治疗的影响对土地在早期尽可能的,沙子填装的范围由10m扩大向外,并且界限通过分级法和分级被稳定。 关于用于这个期间不的区域,不是受基础治疗支配
  • 匿名
2013-05-23 12:26:38
要用于在码头后面的区域是由填写从通道中港池疏浚的沙子进土地形成的。同时,为了避免在早期阶段尽可能晚的地基处理在土地上的影响,砂充填范围扩展表面上由 10 m 和边界稳定分期和分级。有关不能在这一时期使用的面积,是不受地基处理
  • 匿名
2013-05-23 12:28:18
在码头后面有待使用的地区通过填写从在海港盆中的渠道被捞取的沙到土地中被形成。同时,以在早期阶段尽可能远远地避免对陆地新的基础疗法的影响,沙充填物范围表面上被一千万提供和边界被稳定通过上演和评级。关于不要用于这段时期的地区,不取决于基础治疗
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭