当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In combination with the geological conditions, land formation method, and use requirements, foundation treatment methods vary with different areas. The area behind the dock is treated with preloading and vibroflotation method, the common road on the land reserved for the factory, vacuum (combined surcharge) preloading 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In combination with the geological conditions, land formation method, and use requirements, foundation treatment methods vary with different areas. The area behind the dock is treated with preloading and vibroflotation method, the common road on the land reserved for the factory, vacuum (combined surcharge) preloading
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
与地质条件的组合,土地形成方法和用途要求,基础治疗方法变化用不同的区域。在船坞后的区域对待与预先输入和vibroflotation方法,在土地的共同的路预留为工厂,预先输入的真空(联合的额外费)预先输入和,哪些是更好的;并且有为工厂,动态击实和重新填没预留的土地的重的货物路在层数与紧凑土壤。
  • 匿名
2013-05-23 12:24:58
与地质条件、土地形成方法和用途要求的组合,基础治疗方法变化用不同的区域。 区域在船坞之后在土地对待以预先输入和vibroflotation方法,共同的路预留为工厂,真空 (联合的额外费) 预先输入和预先输入,哪些是更好的; 并且重的货物路与为工厂,动态击实和重新填没预留的土地在层数与紧凑土壤。
  • 匿名
2013-05-23 12:26:38
结合地质条件,土地形成方法和使用要求,地基处理方法因不同地区而异。在码头后面的区域用预压治疗和振冲法,为工厂,预留的土地上共同道路真空 (联合的收费) 堆载预压和预加载,准更好 ;和重型货物路与土地预留作厂、 强夯和充填用紧凑的土壤层中。
  • 匿名
2013-05-23 12:28:18
与地质条件,陆地构成方法,使用要求相结合,基础治疗方法以不同领域变化。在码头后面的地区通过预加载和 vibroflotation 方法被对待,为工厂被保留的陆地上的共同路,真空 ( 结合额外费 ) 预加载和预加载,无论哪个是更好的;以及有陆地的重的货物路保留对工厂,动态压实和在有紧凑的土壤的层方面的覆土于。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭