求翻译:Tables 9 and 10 show the probability changes of risk items related to project performance through the risk reduction according to the shipbuilding companies’ scale. The R2 and R3 levels exceeding budget risks of large-scale shipbuilding companies were reduced by 22.5% and 8.0%, respectively, through quality control act是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Tables 9 and 10 show the probability changes of risk items related to project performance through the risk reduction according to the shipbuilding companies’ scale. The R2 and R3 levels exceeding budget risks of large-scale shipbuilding companies were reduced by 22.5% and 8.0%, respectively, through quality control act
问题补充:

  • 匿名
2013-05-23 12:21:38
表9和表10示出了根据本造船公司的规模通过减少的风险相关的项目的性能风险项的概率的改变。
  • 匿名
2013-05-23 12:23:18
表9和10显示风险项目的可能性变动与项目表现有关通过风险减少根据造船公司的标度。22.5%减少超出大规模造船公司的预算风险R2和R3水平,并且8.0%,分别,通过质量管理活动和R3水平规格牢骚和超出时间表风险减少按1.4%和4.2%,分别,通过转承包商管理活动。
  • 匿名
2013-05-23 12:24:58
表9和10显示风险项目的可能性变动与项目表现有关通过风险减少根据造船公司的标度。 22.5%减少超出大规模造船公司的预算风险R2和R3水平,并且8.0%,分别,通过质量管理活动和R3水平规格牢骚和超出时间表风险减少按1.4%和4.2%,分别,通过转承包商管理活动。 如果大规模造船公司减少了质量管理和罢工的风险级别在总部和转承包商,超出时间表风险和超出预算风险的规格牢骚的R3水平风险减少分别为5.8%, 6.4%和10.5%。
  • 匿名
2013-05-23 12:26:38
表 9 和表 10 显示风险项目有关的项目绩效通过根据造船公司的规模的减少风险的概率更改。超过预算风险的大型造船公司分别减少了 22.5%和 8.0%,R2 和 R3 的水平,通过质量控制活动和 R3 级规格的不满和超过时间日程安排风险减少了 1.4%和 4.2%,respectively,通过分包商管理活动。如果大型造船企业减少风险水平的质量控制和罢工在总部和分包商,规范不满,超过时间进度风险,和超过预算风险的 R3 级风险减少分别为 5.8%、 6.4%和 10.5%。