当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Beijing subway train, the maximum operating speed line No. two is 80kinh, the average speed is 35 4Okmh, the speed is controlled by the inverter to realize, the rotating speed of the traction motor, DC side voltage control circuit, inverter output voltage detection signal to the inverter, the inverter controller accord是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Beijing subway train, the maximum operating speed line No. two is 80kinh, the average speed is 35 4Okmh, the speed is controlled by the inverter to realize, the rotating speed of the traction motor, DC side voltage control circuit, inverter output voltage detection signal to the inverter, the inverter controller accord
问题补充:

  • 匿名
2013-05-23 12:21:38
北京地铁列车, 2最大工作速度线号是80kinh ,平均速度为35 4Okmh ,速度由逆变器控制来实现的,牵引电动机,直流侧电压控制电路,逆变器输出电压检测的旋转速度
  • 匿名
2013-05-23 12:23:18
Beijing subway train, no. 2 line of the maximum operating speed is 80 kinh, average 3514 Okmh, the speed control by inverter to achieve, the traction motor speed, the DC side voltage, inverter 3 phase output voltage, etc. detection signal feed inverter control circuit, the inverter control is run in
  • 匿名
2013-05-23 12:24:58
北京地铁,最大操作速度线没有。 二是80kinh,平均速度是35 4Okmh,速度由变换器体会,牵引马达, DC旁边电压控制电路、变换器产品电压侦查信号到变换器,变换器控制器根据操作说明书和马达牵引特征的转动的速度控制计算指示的电压和频率要求,并且变换成开关PWM信号控制变换器开关,为了达到电动机转速的控制 (鸸),为铁路牵引,变换器马达系统应该符合以下要求: 光滑典型滑和虚度光阴的开始,禁止,再生制动,宽速度范围。
  • 匿名
2013-05-23 12:26:38
北京地铁列车的最高运行速度线两个号是 80kinh,平均速度是 35 4Okmh,速度由逆变器实现,牵引电机、 直流侧电压控制电路、 逆变器输出电压检测信号对逆变器、 逆变器控制器的操作说明和电机牵引特性来计算的电压和频率要求的指令根据转速控制并转化为开关 PWM 信号控制逆变器开关,以实现电机转速控制 (EMU) 的铁路牵引逆变器电机系统应满足以下要求: 光滑滑和空转、 再生制动典型起动、 抑制、 更宽的速度范围。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭