当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:startCity rail transit trains, inverter common AC drive system of a motor control scheme has two kinds: the first kind is the 1 inverter control 4 motors; the second is to control the 2 motors l inverters, in view of the Beijing metro train, rated capacity of 1 motor is 18OkW, so the first scheme inverter the capacity 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
startCity rail transit trains, inverter common AC drive system of a motor control scheme has two kinds: the first kind is the 1 inverter control 4 motors; the second is to control the 2 motors l inverters, in view of the Beijing metro train, rated capacity of 1 motor is 18OkW, so the first scheme inverter the capacity
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
startCity路轨运输火车,变换器共同的电动机控制计划的AC驱动系统有二种类: 第一种类是1变换器控制4马达; 秒钟是由于北京地铁火车控制2个马达l变换器, 1个马达对估计的容量是18OkW,因此容量需要是1000K的第一台计划变换器, A,第二份计划为变换器容量需要关于SO0kVA可以是,推荐对第二份控制计划,即1变换器控制2马达的用途,为以下原因: 车城市轨道交通¹ s通常是四个轨车,第二份计划是1变换器控制来路不明的飞机2马达,二操纵的机架4马达比较1台变换器第一份控制计划,第二份计划可能使用黏附力系数在轮子之间,并且路轨更加充分地是,有助于戏剧的牵引力量; 采取第二份计划,每台变换
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭