当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:n integrated procurement method, the payment is based on the achieved building performance; thus, the payment is non-adversarial. Since the architect, engineer and contractor have a wider responsibility on the quality of the design and the building, the payment is linked to a measurement system of the functional and te是什么意思?

待解决 悬赏分:1 - 离问题结束还有
n integrated procurement method, the payment is based on the achieved building performance; thus, the payment is non-adversarial. Since the architect, engineer and contractor have a wider responsibility on the quality of the design and the building, the payment is linked to a measurement system of the functional and te
问题补充:

  • 匿名
2013-05-23 12:21:38
N集成采购方式,付款是基于实现建筑性能;
  • 匿名
2013-05-23 12:23:18
n集成获得方法,付款根据被完成的修造的表现;因此,付款是非对抗。从建筑师,工程师和承包商有在设计的质量的一个更宽的责任,并且大厦,付款与大厦的功能和技术表现的测量系统连接在某一时期。报酬成为达到优选的质量的刺激。
  • 匿名
2013-05-23 12:24:58
n集成获得方法,付款根据被完成的修造的表现; 因此,付款non-adversarial。 从建筑师,工程师和承包商在设计的质量有一个更宽的责任,并且大厦,付款与大厦的功能和技术表现的测量系统连接在某一时期。 报酬成为达到优选的质量的刺激。 如果超出极小的客户的要求的大厦演员成功提供更高的增加价值,他们在依照将接受奖金到客户的额外获取。 也改进透明度的水平。 往来赊欠帐户是一台优秀仪器,在赌金保管人赞成将分享的信息和它的详细程度 (InPro条件下, 2009年)。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭