当前位置:首页 » 互助翻译 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A transversely cantilevered setting method was applied for its arch ring construction. The arch ring was divided into several arch ribs, and each rib was longitudinally divided into several precast concrete hollow blocks. Side ribs were erected by transversely setting with the support of the erected central rib. The br是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A transversely cantilevered setting method was applied for its arch ring construction. The arch ring was divided into several arch ribs, and each rib was longitudinally divided into several precast concrete hollow blocks. Side ribs were erected by transversely setting with the support of the erected central rib. The br
问题补充:

我来回答我要举报我要补充 我也要提问 我要翻译
  • 匿名
  支持(0)  |   反对(0)   |  我来评论 2013-05-23 12:21
横向悬臂设置方法应用于其拱圈施工。

* 验证码:  
  • 匿名
  支持(0)  |   反对(0)   |  我来评论 2013-05-23 12:23
正在翻译,请等待...

* 验证码:  
  • 匿名
  支持(0)  |   反对(0)   |  我来评论 2013-05-23 12:24
正在翻译,请等待...

* 验证码:  
  • 匿名
  支持(0)  |   反对(0)   |  我来评论 2013-05-23 12:26
横悬挑的设置方法被应用其拱圈施工。拱圈被划分成几个拱肋,和每个肋纵向划分成几个预制混凝土空心砌块。通过横向设置的竖立中央肋支持竖起了一面肋骨。这座桥是由公路勘测和设计研究所的广东省设计及建造由广东公路工程部。它落成于 1972 年。

* 验证码:  
文字链
  • 匿名
  支持(0)  |   反对(0)   |  我来评论 2013-05-23 12:28
正在翻译,请等待...

* 验证码:  
我来回答

我来回答:

参考资料:
* 验证码:  
   积分规则
登录后回答可以获得积分奖励,并可以查看和管理所有的回答。登录 | 注册
最新问题
相关问题
 
我要翻译和提问
X
等你来回答
 
网站首页 | 网站地图 | 排名推广 | 广告服务 | 积分换礼 | 网站留言 | RSS订阅