当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Two stone arches of 6 m long each were arranged on either bank providing under crossing traffic. The bridge was constructed on steel truss falsework supported by temporary piers. It was designed and constructed by Highway Engineering Bureau,Communications Department of Henan Province and completed in 1961.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Two stone arches of 6 m long each were arranged on either bank providing under crossing traffic. The bridge was constructed on steel truss falsework supported by temporary piers. It was designed and constructed by Highway Engineering Bureau,Communications Department of Henan Province and completed in 1961.
问题补充:

  • 匿名
2013-05-23 12:21:38
6米二石拱门长每个被安排于下道爱情通无论是银行提供。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
6 m二石曲拱长中的每一在提供在横穿交通之下的任一家银行被安排了。 桥梁在临时码头支持的钢捆脚手架被修建了。 它是由Highway Engineering局, 1961年河南省的通信部门设计的并且修建并且完成了。
  • 匿名
2013-05-23 12:26:38
上任一银行能提供下过境交通安排了 6 米长每两个石拱。这座桥建成支持的临时墩的钢桁架脚手架上。它是设计和建造的公路工程局,河南通信部和在 1961 年完成。
  • 匿名
2013-05-23 12:28:18
6 米的两个石头拱渴望每个在与交通相交下提供的每家银行上被整理。桥在被临时码头支持的钢铁 truss falsework 被建造。被高速公路工程局策划和建造,河南省的通讯部门和完成在 1961 年。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭