当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In Shanghai, the elevated inner beltway was completed in 1996. Subsequently, there has appeared an upsurge of erecting different-sized grade separation structures on urban main streets and express highways. Until now, in Beijing alone,80-odd large overcrossings have been erected, which makes the city rank the first in 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In Shanghai, the elevated inner beltway was completed in 1996. Subsequently, there has appeared an upsurge of erecting different-sized grade separation structures on urban main streets and express highways. Until now, in Beijing alone,80-odd large overcrossings have been erected, which makes the city rank the first in
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在上海,高的内在环路在1996年完成了。随后,那里有出现架设在都市大街和明确高速公路上的不同尺寸立体交叉结构高潮。直到现在,在单独的北京, 80多的大上跨交叉被架设了,做城市数量上排列第一在全国和标度。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
在上海,1996 年完成了高架内环城公路。随后,出现急剧增加的架设在城市主要街道和高速公路上的不同规模等级分离结构。直到现在,仅在北京地区,已竖立 80 奇数大 overcrossings,这使得在数量和规模在全国城市排名第一。
  • 匿名
2013-05-23 12:28:18
在上海,提高内部环形公路在 1996 年完成。随后,在那里似乎是使不同依大小排列的等级分离直立的一个高潮组织在城市的大街上和表达高速公路。直到如今在北京单独,超过 80 个大过分交叉点被直立了,在数字和规模方面在整个国家使城市等级成为第一。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭