求翻译:首先,将中心调整到位,立好门架,利用滑移系统和千斤顶将模板调整到工作位置,装好机械撑杆,再将外模板调整到位,利用对拉杆将外模与内模对拉起来,再次检查模板是否在工作状态,最后可进行浇筑。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
首先,将中心调整到位,立好门架,利用滑移系统和千斤顶将模板调整到工作位置,装好机械撑杆,再将外模板调整到位,利用对拉杆将外模与内模对拉起来,再次检查模板是否在工作状态,最后可进行浇筑。
问题补充:

  • 匿名
2013-05-23 12:21:38
First, adjust the center in place, up the door frame, the use of slip systems, and jacks to adjust the template to the work location, install a good mechanical pole, and then outside to adjust the template in place, use of the rod within the outer mold and mold on the pull up again check whether the
  • 匿名
2013-05-23 12:23:18
First of all, will be adjusted to the Center, the doors, using slip system structure and 1000 diplomatic templates will be adjusted to the working location, fitted with good mechanical Pole, and then the outer template adjustments, use the joystick to model and mold, and once again pulled together t
  • 匿名
2013-05-23 12:24:58
First, the centering adjustment arriving, will set up the gate frame, adjusts using the slipping system and the hoisting jack the template the working position, installs the mechanical stay rod, again outside the template adjustment arriving, will use to the tension bar to pulls the outline templet
  • 匿名
2013-05-23 12:26:38
First, adjust the Centre in place, vertical door frames, using sliding systems and Jack adjusting the template to work locations, installed machinery Struts, and template adjustments in place outside, model used to lock the external and internal model to pull up, check whether the template again in
  • 匿名
2013-05-23 12:28:18
First, adjust the Centre in place, vertical door frames, using sliding systems and Jack adjusting the template to work locations, installed machinery Struts, and template adjustments in place outside, model used to lock the external and internal model to pull up, check whether the template again in
 
 