当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4.焊接电芯负极,二次四点;焊好后打开上压块,用两条15mm长的黄胶带将Thermistor固定在电芯上;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4.焊接电芯负极,二次四点;焊好后打开上压块,用两条15mm长的黄胶带将Thermistor固定在电芯上;
问题补充:

  • 匿名
2013-05-23 12:21:38
4. Welding batteries negative, the second four-point; After welding on the briquetting open, 15mm long with two yellow tape fixed to the batteries on Thermistor;
  • 匿名
2013-05-23 12:23:18
4) welding batteries 2 times, and negative terminal 4 opened after a good point; welding pressure on Block 15 mm long, with two yellow tape Thermistor will be fixed in batteries;
  • 匿名
2013-05-23 12:24:58
4. welds receives a telegram the core cathode, two four; After welds opens the briquetting, fixes with two 15mm long yellow adhesive tapes Thermistor on the electricity core;
  • 匿名
2013-05-23 12:26:38
4. welding cell anode, secondary four points; welding press on after the opening, with two 15mm on the yellow tape to secure the Thermistor in the cell;
  • 匿名
2013-05-23 12:28:18
4. welding cell anode, secondary four points; welding press on after the opening, with two 15mm on the yellow tape to secure the Thermistor in the cell;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭