当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:History shows that the majority of cost influencing decisions must be made in a very early stage of the project, even if the information is very limited and the design is not yet stable. This emphasizes that the LORA must be repeated throughout the life cycle so that the requirement for adoption of the maintenance conc是什么意思?

待解决 悬赏分:1 - 离问题结束还有
History shows that the majority of cost influencing decisions must be made in a very early stage of the project, even if the information is very limited and the design is not yet stable. This emphasizes that the LORA must be repeated throughout the life cycle so that the requirement for adoption of the maintenance conc
问题补充:

  • 匿名
2013-05-23 12:21:38
历史表明,多数影响决策的成本必须在项目的早期阶段进行,即使信息是非常有限的,设计尚不稳定。
  • 匿名
2013-05-23 12:23:18
历史表示,进入项目的非常早期必须做费用影响决定的多数,即使信息是非常有限的,并且设计不是槽枥。这强调必须重复LORA在生命周期中,以便保养概念的采用的要求可以及时地被辨认。
  • 匿名
2013-05-23 12:24:58
历史表示,进入项目的非常早期必须做费用影响决定的多数,即使信息是非常有限的,并且设计不是槽枥。 这强调必须重覆LORA在生命周期中,以便维护概念的采用的要求可以及时地被辨认。
  • 匿名
2013-05-23 12:26:38
历史表明,大部分的成本影响决定必须作出非常早期的项目,即使是非常有限的信息,设计尚不稳定。这就强调罗拉必须重复整个生命周期,以便可以及时查明通过维护概念的要求。
  • 匿名
2013-05-23 12:28:18
历史显示多数花去的影响决定必须被做出在很项目的早期阶段,即使信息是很有限的和设计尚未是稳定的。这强调 LORA 必须在整个生命周期被重复,以便维护概念的采用的要求可以及时被标识。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭