当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to this project characteristic, this article chooses to the structure system most disadvantageous construction stage as well as the king post stage carries on the computation analysis with emphasis, obtains the most disadvantageous construction stage Tension controlling force, as well as the king post and the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to this project characteristic, this article chooses to the structure system most disadvantageous construction stage as well as the king post stage carries on the computation analysis with emphasis, obtains the most disadvantageous construction stage Tension controlling force, as well as the king post and the
问题补充:

  • 匿名
2013-05-23 12:21:38
根据本项目的特点,本文选择结构体系最不利施工阶段以及国王后级进行计算分析的重点,得出最不利施工阶段张力的控制力,以及王柱和
  • 匿名
2013-05-23 12:23:18
根据这个项目特征,这篇文章选择对结构系统多数不利的建筑阶段以及中柱阶段继续与重点的计算分析,得到最不利的建筑阶段张力控制力量,以及中柱和主人塔最大的弯曲力矩,为悬臂式建筑提供可靠的支持
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
根据本项目特点,这篇文章选择到结构系统最不利施工阶段以及国王开机自检阶段进行计算分析强调,获得最不利施工阶段张力控制力,以及国王员额和主机塔最大弯曲力矩,为提供可靠支持,悬臂施工
  • 匿名
2013-05-23 12:28:18
根据这种项目特征,这篇文章到结构系统选择像中柱阶段一样好地的最不利的建造阶段以强调继续计算分析,获取控制力量的最不利的建造阶段紧张,以及中柱和主人塔最大弯曲时刻,提供可靠的支持用于悬梁建造
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭