当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Double or three crane, in order to reduce the frictional resistance of steel column base and the ground, one of them is the auxiliary machine, hang point choice in steel column below, play with the host davit hook, along with a host of lifting, vice confidential walking or turning, in the delivery process, the auxiliar是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Double or three crane, in order to reduce the frictional resistance of steel column base and the ground, one of them is the auxiliary machine, hang point choice in steel column below, play with the host davit hook, along with a host of lifting, vice confidential walking or turning, in the delivery process, the auxiliar
问题补充:

  • 匿名
2013-05-23 12:21:38
双或三起重机,为了减少钢柱底的摩擦阻力和地面上,其中之一是辅助机,悬挂点选择在钢柱下面,与主机吊架钩打,沿着与主提升,
  • 匿名
2013-05-23 12:23:18
双或三抬头,为了减少钢圆柱基础和地面摩擦阻力,他们中的一个是辅助机器,吊在下面钢专栏的点选择,与主人吊艇架勾子的戏剧,与举一起的主人,副机要走或转动,在交付过程中,辅助机器采取零件装载,钢圆柱基础被提供到上面钢专栏基础,辅助机器勾子装载,卸载,现在主持装载,到位钢的专栏。
  • 匿名
2013-05-23 12:24:58
双或三起重机,为了减少钢专栏基地摩擦阻力和地面,他们中的一个是辅助机器,吊点选择在钢专栏如下,戏剧用主人吊艇架勾子,与举一起,副机要走的主人或转动,在交付过程中,辅助机器作为零件装载,钢专栏基地被提供到钢专栏基础上面,辅助机器勾子装载,卸载,现在主持装载,钢专栏到位。
  • 匿名
2013-05-23 12:26:38
双人或三起重机,以减少钢结构柱基和地面的摩擦阻力,其中之一就是辅助机,坑点选择在下面,戏剧与主机吊艇架钩、 钢结构柱吊装的主机,以及副机密行走或在分娩过程中,转向辅助机带部分负荷时,传递到以上的钢结构柱基础的钢结构柱基础辅助机钩负载,卸载,现在主机负载,钢列中的地方。
  • 匿名
2013-05-23 12:28:18
双或者三台起重机,以减少钢铁栏基础的摩擦的抵抗和地,其中之一是辅助的机器,在下面钢铁专栏中悬挂点选择,拿着主人吊艇柱挂钩玩,一起一大堆升起,恶习保密步行或转,在发送过程中,辅助的机器带走角色装货,被递交给上面钢铁栏基础的钢铁栏基础,辅助的机器挂钩装货,卸载,现在主持负荷,钢铁栏在合适的位置。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭