当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Both TBM and NATW are adopted in the construction of diversion tunnels. The No. 1 and No. 3 tunnels with a diameter of 13 m are constructed by TBM. However, the No. 2 and No. 4 tunnels are the four-arcs ones, which are constructed by NATW. The tests show that the maximum principal stress is about 70 MPa and the minimum是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Both TBM and NATW are adopted in the construction of diversion tunnels. The No. 1 and No. 3 tunnels with a diameter of 13 m are constructed by TBM. However, the No. 2 and No. 4 tunnels are the four-arcs ones, which are constructed by NATW. The tests show that the maximum principal stress is about 70 MPa and the minimum
问题补充:

  • 匿名
2013-05-23 12:21:38
既TBM和NATW都采用引水隧洞的施工。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
TBM和NATW在转换隧道的建筑被采取。 没有。 1和没有。 3个隧道与13 m直径由TBM修建。 然而,没有。 2和没有。 4个隧道是四弧一个,由NATW修建。 试验证明最大主应力约为70 MPa,并且极小的主应力约为31 MPa。
  • 匿名
2013-05-23 12:26:38
在导流洞施工中采用 TBM 和建立。Tbm 的第 1 和第 3 号隧道直径为 13 米。然而,第 2 和第 4 条隧道是四-弧形部分,通过建立构成的。测试表明最大主应力是大约 70 MPa 和最小主应力是约 31 MPa。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭