当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:inthe 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced是什么意思?

待解决 悬赏分:1 - 离问题结束还有
inthe 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced
问题补充:

  • 匿名
2013-05-23 12:21:38
在矿井地铁202节屏蔽大连间隔接近现有桥梁为基础,对地表沉降和桥墩沉降观测站成立。
  • 匿名
2013-05-23 12:23:18
在地铁盾在几乎接近的大连间隔时间的第202部分与现有的桥梁作为依据,表面解决和桥梁码头解决观测站建立。在横穿建筑监视的62天之前,详细分析监视数据。
  • 匿名
2013-05-23 12:24:58
在地铁盾大连间隔时间的第202部分在与现有的桥梁的接近的接近度作为依据,表面解决和桥梁码头解决观测站建立。 在横穿建筑监视的62天以前,监视数据详细分析。 当表面盾隧道建筑导致的沉淀,在测量点起动速度之上比安定的起始的速度测量点在双方,大约2-2.5次,沉淀范围更高大约8提早快速对10m。 从码头边快速地首先起动的和开始比旁边近码头,是大约1.2次,盾建筑的解决主要被集中在距离在盾机器前后10m的挖掘,占80.72%-81.6%总解决。 在最高的风险为盾建筑区域,我们应该加强监视和及时地做后备计划。 © (2014) Trans技术出版物,瑞士。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭