当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:■ Finally, the planner should make a real profile for laid cable showing the boundaries route direction, depth of laying with respect to the ground zero level, area to feed by the cable, date of laying, locations of the straight joints & SEDC team who execute & approved the works.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
■ Finally, the planner should make a real profile for laid cable showing the boundaries route direction, depth of laying with respect to the ground zero level, area to feed by the cable, date of laying, locations of the straight joints & SEDC team who execute & approved the works.
问题补充:

  • 匿名
2013-05-23 12:21:38
■最后,策划者应该为铺设的电缆显示边界的路线方向,深度相对于地面零电平,面积铺设铺设,直缝及SEDC队地点的连接线,日喂真正的简历谁
  • 匿名
2013-05-23 12:23:18
■终于,计划者应该做显示界限路线放置的方向、深度关于地面零电平,区域哺养由缆绳,执行平直的联接& SEDC队的日期放置,地点的被放置的缆绳的真正的外形&批准了工作。
  • 匿名
2013-05-23 12:24:58
■ 终于,计划者应该做真正的外形为显示界限路线放置的方向、深度关于爆心投影水平,区域哺养由缆绳,执行平直的联接& SEDC队的日期放置,地点的被放置的缆绳&批准了工作。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
? 最终,计划者应该做出显示边界传送方向的被放的电缆的一段实际简介,关于地零水平放的深度,按电报吃东西的地区,放的日期,直关节和执行工作,和赞同工作的 SEDC 小组的位置。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭