求翻译:To find the setting for optimal start control,the simulation was repeated on theplatform with different operating chillernumbers in each case. One chiller wasswitched on 1 h before the buildingis occupied. The pre-cooling lead time and its energy consumption were recorded. Then,two chillers were put into operation in t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
To find the setting for optimal start control,the simulation was repeated on theplatform with different operating chillernumbers in each case. One chiller wasswitched on 1 h before the buildingis occupied. The pre-cooling lead time and its energy consumption were recorded. Then,two chillers were put into operation in t
问题补充:

  • 匿名
2013-05-23 12:21:38
找到设定最佳起动控制,模拟,重复上theplatform在每种情况下不同的操作chillernumbers 。
  • 匿名
2013-05-23 12:23:18
要发现优选的起动控制的设置,模仿在用不同的经营的chillernumbers的theplatform被重复在每个案件。在buildingis占领了前,一致冷物在1个h wasswitched。预冷却的前置时间和它的能源消耗被记录了。然后,两致冷物被放入在thesecond测试的操作,并且对应的预冷却的前置时间和能源消耗被记录了。这个过程被重复了,直到更加寒冷的运行数字到达了它的最大价值。
  • 匿名
2013-05-23 12:24:58
要发现设置为优选的起动控制,模仿在用不同的经营的chillernumbers的theplatform被重覆在每个案件。 在buildingis占领了之前,一致冷物在1 h wasswitched。 预冷却的前置时间和它的能源消耗被记录了。 然后,二致冷物在thesecond测试被放入操作,并且对应的预冷却的前置时间和能源消耗被记录了。 这个过程被重覆了,直到更加寒冷的经营的数字到达了它的最大价值。 数字和预冷却的前置时间与最少能源消耗被选择了作为最优控制为案件。
  • 匿名
2013-05-23 12:26:38
若要找到最佳的状态开始控制设置,模拟被重覆上与在每个案例的不同经营 chillernumbers 很了。一个冷水机组 wasswitched 在之前占领建筑物建筑 1 h。录预冷的时间,其能源消费量。然后,两个冷水机组投入商业运行在第二测试中录得相应的预冷铅时间和能源的消耗。此过程重复,直到经营一些冷水机组达到其最大值。数量和能耗最低预冷的前置时间被选择作为案件的最优控制。
  • 匿名
2013-05-23 12:28:18
发现优化的开始控制的设置,模拟在每个案例中用不同操纵 chillernumbers 在 theplatform 被重复。一位受冻者 wasswitched 在 1 h buildingis 占领之前。冷却前的前置时间和其能量消耗被记载。然后,两位受冻者是放进在第二个测试和相应冷却前的前置时间和能量消耗中的操作被记载。这个过程被重复直到操纵被到达的数字的受冻者其最大价值。数字和具最小的能量消耗的冷却前的前置时间为案例被选用为优化的控制。
 
 