当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Several case studies have suggested that the majority of these failures result from poor drainage and subsequent build-up of pore water pressures behind the porous brick barricades constructed across the drives to contain the fill. This paper focuses on the fundamental aspects of permeability and drainage characteristi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Several case studies have suggested that the majority of these failures result from poor drainage and subsequent build-up of pore water pressures behind the porous brick barricades constructed across the drives to contain the fill. This paper focuses on the fundamental aspects of permeability and drainage characteristi
问题补充:

  • 匿名
2013-05-23 12:21:38
一些案例研究表明,大多数这些故障从引流不畅和随后集结背后的整个驱动器构建成含有填充的多孔砖路障孔隙水压力的结果。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
几个案例研究建议大部分的这些故障造成排水不畅和随后集结的背后建造跨驱动器包含填充多孔砖路障的孔隙水压力。本白皮书重点渗透的基本方面和排水特性的水力冲填地雷。在詹姆斯 · 库克大学建造一个 1: 100 的实验室进行缩放模型,模仿典型的地下采场。
  • 匿名
2013-05-23 12:28:18
若干案例研究表明了这些故障的多数由于粗略的排出物和毛孔水的后续增长在后面对渗水的砖块施加压力阻塞跨越建造行驶控制充满。这篇文章着重于可渗透性和排水特征的基本方面水力填充矿。一个 1:100 个实验室被测量的模型,模仿一典型地下 stope 在詹姆士·库克处被建造大学。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭