当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Mining is a major industry worldwide, where hydraulic fills are commonly used for backfilling the underground voids created in the ore removal process. Hydraulic fills placed in the form of slurry drain through free draining barricades that block the access drives during the filling process. Failure of the barricades,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Mining is a major industry worldwide, where hydraulic fills are commonly used for backfilling the underground voids created in the ore removal process. Hydraulic fills placed in the form of slurry drain through free draining barricades that block the access drives during the filling process. Failure of the barricades,
问题补充:

  • 匿名
2013-05-23 12:21:38
矿业是全球主要的行业,其中液压填充通常用于回填的矿拆除过程中产生的地下空洞。
  • 匿名
2013-05-23 12:23:18
采矿是一家大型企业全世界,其中水力积土为重新填没在矿石撤除过程创造的地下空隙是常用的。以泥浆的形式被安置的水力积土通过任意排泄在填装的过程中阻拦通入驱动的护拦漏。护拦的失败,
  • 匿名
2013-05-23 12:24:58
采矿是一家大型企业全世界,水力积土为重新填没在矿石撤除过程的地方创造的地下空隙是常用的。 以泥浆的形式被安置的水力积土通过任意排泄在填装的过程期间,阻拦通入驱动的护拦漏。 护拦的失败,
  • 匿名
2013-05-23 12:26:38
采矿是全世界的主要产业液压填充,通常用于回填在矿石删除过程中创建的地下空隙。液压填充放在通过阻止访问驱动器在灌装过程中的自由排水路障浆流失的窗体。失败的路障,
  • 匿名
2013-05-23 12:28:18
开矿是一种主要全世界的工业,其中水力充满通常是用于覆土于在矿石删除过程中被创造的地下空间。水力充满放置以至阻挡访问权限的自由排水路障的 slurry 排水的形式在为人装满过程期间开车。路障的故障,
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭