当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:• When perforations of re used wells are isolated prior to cement quality logging, set the bridge plug as close as possible to the top of the existing perforations in order to allow for logging across as much as possible of bottom of the cap rock, and if possible across the direct cap seal (Lower Benxi)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
• When perforations of re used wells are isolated prior to cement quality logging, set the bridge plug as close as possible to the top of the existing perforations in order to allow for logging across as much as possible of bottom of the cap rock, and if possible across the direct cap seal (Lower Benxi)
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
•\t当稀土使用的井的穿孔在采伐时水泥的质量之前被隔绝,若可能设置桥梁插座一样紧密尽可能在现有的穿孔的上面为了考虑到尽量采伐盖帽岩石的底部,和横跨直接盖帽封印(更低的本溪)
  • 匿名
2013-05-23 12:24:58
• 当再使用的井的穿孔在水泥质量之前被隔绝采伐时,设置桥梁插座一样紧密尽可能在现有的穿孔的上面为了考虑到尽量采伐盖帽岩石的底部和,如果可能横跨直接盖帽封印 (降低Benxi)
  • 匿名
2013-05-23 12:26:38
• 当穿孔的 re 用井被隔离水泥质量登录之前设置桥塞尽可能接近到现有穿孔的顶部,以便为整个日志记录作为底部帽尽可能多岩石,和如果可能跨直接盖密封 (低本溪)
  • 匿名
2013-05-23 12:28:18
•当使用孔状接缝的水井都是孤立在水泥质量记录,将大桥即插即在尽可能接近顶部的孔状接缝的存在,以便登录应尽可能多地盖底部的岩石,如果可能的话在直接降低油缸盖密封圈[本溪]
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭