当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:After tunnel construction, besides the lining concrete surface, the inspection of lining quality mainly depends on construction record and experimental data. All these can’t reveal the lining thickness and voids behind the lining. But by use of ground penetrating radar, this problem could be effectively solved.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
After tunnel construction, besides the lining concrete surface, the inspection of lining quality mainly depends on construction record and experimental data. All these can’t reveal the lining thickness and voids behind the lining. But by use of ground penetrating radar, this problem could be effectively solved.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在隧道建筑以后,除衬里凝结面以外,衬里质量的检查主要取决于施工新纪录和实验数据。所有这些不可能显露排行的厚度和空隙在衬里后。但是利用地面渗透的雷达,能有效地解决这个问题。
  • 匿名
2013-05-23 12:24:58
在隧道建筑以后,除衬里具体表面以外,衬里质量的检查主要取决于建筑纪录和实验性数据。 所有这些不可能显露排行的厚度和空隙在衬里之后。 但利用地面渗透的雷达,这个问题能有效地解决。
  • 匿名
2013-05-23 12:26:38
后隧道施工,除了衬砌混凝土表面,检查的衬砌质量主要取决于施工记录和试验数据。这些都不能透露的衬砌厚度和衬砌背后的空隙。但通过使用地面穿透雷达,可以有效地解决这一问题。
  • 匿名
2013-05-23 12:28:18
隧道工程后,除了对衬砌混凝土表面,衬层质量检查主要是取决于建设纪录和实验数据。 所有这些不可以透露的衬层厚度和孔隙内衬的后面。 但通过使用的穿透地面的雷达,这一问题可以得到有效解决。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭