求翻译:4.3.5.1 3 When specified, in addition to the final AC high potential test, the stator insulation will also be tested by means of the DC Controlled Overvoltage Test per IEEE 95. The maximum voltage for this controlled overvoltage test shall be 1.5 times the rated (rms) terminal voltage times 1.7.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4.3.5.1 3 When specified, in addition to the final AC high potential test, the stator insulation will also be tested by means of the DC Controlled Overvoltage Test per IEEE 95. The maximum voltage for this controlled overvoltage test shall be 1.5 times the rated (rms) terminal voltage times 1.7.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
4.3.5.1 3当指定,除最后的AC高潜在的测试之外,定子绝缘材料通过DC受控制超电压测试也将被测试每IEEE 95。这个受控超电压测试的最大电压将是1.5倍额定的(rms)终端电压时代1.7。
  • 匿名
2013-05-23 12:24:58
4.3.5.1 3 除最后的AC高潜在的测试之外,当指定,定子绝缘材料时通过DC受控制超电压测试也将被测试每IEEE 95。 最大电压为这个受控超电压测试将是1.5倍额定的 (rms) 终端电压时代1.7。
  • 匿名
2013-05-23 12:26:38
4.3.5.1 3 时指定,除了最后交流高潜在的测试,还将通过直流控制电压测试每 IEEE 95 测试定子绝缘。此控制过电压测试最大电压应 1.5 倍的额定 (rms) 终端电压 1.7 倍。
  • 匿名
2013-05-23 12:28:18
3 4.3指定时,除了最后交流高潜力测试,定子绝缘测试还将通过直流控制过压测试每个IEEE95。 最大电压过压测试这一受控为1.5倍额定RMS][终端电压1.7倍。
 
 