当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Check that the items of inspection, testing, calibration, maintenance, etc., methods, dates, results (with the description of the corrective action taken in case of rejection) and other necessary data are properly recorded for each unit of equipment and in accordance with the established manufacturing equipment control是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Check that the items of inspection, testing, calibration, maintenance, etc., methods, dates, results (with the description of the corrective action taken in case of rejection) and other necessary data are properly recorded for each unit of equipment and in accordance with the established manufacturing equipment control
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
检查检查、测试、定标、维护等等,方法、日期,结果项目(与在拒绝的情况下采取的惩治行为的描述),并且其他必要的数据为每套成套装备适当地被记录和符合标准建立的制造器材的控制,并且所有这些纪录是适当的。
  • 匿名
2013-05-23 12:24:58
检查检查,测试,定标、维护、等等、方法、日期、结果以在拒绝的情况下 (采取的描述惩治行为和其他必要的) 数据项目为每套成套装备适当地被记录和与建立的制造器材控制符合标准,并且所有这些纪录是适当的。
  • 匿名
2013-05-23 12:26:38
检查的项目的检验、 测试、 校准、 维修等,方法、 日期、 结果 (与排斥反应的情况下所采取的纠正行动的说明) 和其他必要的数据正确地记录为每个设备的单位和按照既定的制造设备控制标准和所有这些记录是适当的。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭