当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Check that all the units of manufacturing equipment are properly installed and controlled in accordance with the established manufacturing equipment control standard. Perform this check at the actual installation site of each unit of equipment and by requesting explanations from the person in charge of the unit.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Check that all the units of manufacturing equipment are properly installed and controlled in accordance with the established manufacturing equipment control standard. Perform this check at the actual installation site of each unit of equipment and by requesting explanations from the person in charge of the unit.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
检查制造器材所有单位适当地被安装并且被控制符合建立的制造器材控制标准。在每套成套装备实际设施站点执行这检查和通过请求从人的解释负责单位。
  • 匿名
2013-05-23 12:24:58
检查制造器材所有单位适当地安装并且被控制与建立的制造器材控制标准符合。 执行这检查在每套成套装备实际设施站点和通过请求解释从人负责单位。
  • 匿名
2013-05-23 12:26:38
检查所有生产设备的单位安装正确,按照既定的制造设备控制控制标准。执行此检查每个股的设备,并通过从该单位负责人请求解释实际安装现场的。
  • 匿名
2013-05-23 12:28:18
检查所有单位的制造设备已正确安装,并按照控制的设立新的制造设备控制标准。 执行此检查的实际安装在站点的每个单元的设备和要求解释的人充电的装置。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭