当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:CGGC shall be fully responsible for the execution of the Project Works as described in Part II hereinafter and all such works shall be executed strictly in accordance with the provision of the MEW Contract. CGGC shall provide all labour, materials, constructional plants, temporary works and everything, whether of a per是什么意思?

待解决 悬赏分:1 - 离问题结束还有
CGGC shall be fully responsible for the execution of the Project Works as described in Part II hereinafter and all such works shall be executed strictly in accordance with the provision of the MEW Contract. CGGC shall provide all labour, materials, constructional plants, temporary works and everything, whether of a per
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
CGGC对项目工程的施行以后将负责充分地正如第II部分所描述,并且所有这一类工作将确实地被执行符合喵喵叫合同的供应。CGGC将提供所有劳方,材料,建设植物,临时工作,并且一切,永久或临时自然,测试、项目工程的完成和维护根据喵喵叫对于施行是必需的在和是否收缩文件。
  • 匿名
2013-05-23 12:24:58
CGGC将负责充分地对的施行项目工程如所描述以后在第II部分和所有这一类工作将严密地被执行与喵喵叫合同的供应符合。 CGGC将提供所有劳方,材料,建设植物,临时工作,并且一切,永久或临时自然,测试,项目工程的完成和维护根据喵喵叫为施行需要的在和是否收缩文件。
  • 匿名
2013-05-23 12:26:38
CGGC 应完全负责的项目工程如以下部分所述第二执行和所有此类工作应根据提供的水电部合同严格执行。CGGC 应提供所有劳动力、 材料、 施工植物、 临时工程和一切,是否永久或临时性质的和执行,所需的测试,完成和水电部合同文件根据项目工程的维护。
  • 匿名
2013-05-23 12:28:18
cggc应完全负责执行的项目工程中所述第二部分下称,所有这些作品均应执行严格按照提供的新合同。 cggc应提供一切劳务、材料、结构植物、临时工程及一切,无论是常任理事国或临时性要求和为执行、测试、完成和维护的项目工程的水电部根据合同文档。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭