当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The construction item cost control primary purpose, lies in through cost management each method, the promotion reduces the construction item cost unceasingly, achieved possible to realize the lowest target cost request.When implements the cost minimizing principle, should pay attention reduces the cost the possibility 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The construction item cost control primary purpose, lies in through cost management each method, the promotion reduces the construction item cost unceasingly, achieved possible to realize the lowest target cost request.When implements the cost minimizing principle, should pay attention reduces the cost the possibility
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
建筑项目成本控制根本目的,谎言通过费用管理每个方法,促进减少不断地花费的建筑项目,达到的可能体会最低的目标成本请求。当贯彻费用使减到最小的原则,应该支付时注意减少费用可能性和合理费用使减到最小。
  • 匿名
2013-05-23 12:24:58
建筑项目成本控制根本目的,谎言通过费用管理每个方法,促进减少不断地花费的建筑项目,达到的可能体会最低的目标成本请求。当贯彻费用使减到最小的原则,应该支付时注意减少费用可能性和合理费用使减到最小。
  • 匿名
2013-05-23 12:26:38
施工项目成本控制主要目的,在于通过成本管理的每个方法,促进降低成本不断,达到的可能实现最低的目标成本要求的建设项目。当实现成本最小化的原则,应注意减少了成本的可能性和合理的成本最小化。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭