当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The heat exchanger construction is very important and crucial. The outlet valve is usually installed at the top of the machine that means that a big amount of air will go through the heat exchanger. The best way to certify that the heat exchanger is free from any manufacturing defect is asking the manufacturer for a Pr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The heat exchanger construction is very important and crucial. The outlet valve is usually installed at the top of the machine that means that a big amount of air will go through the heat exchanger. The best way to certify that the heat exchanger is free from any manufacturing defect is asking the manufacturer for a Pr
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
热转换器建筑是非常重要和关键的。出口阀通常被安装在意味着的机器顶部大量的空气将审阅热转换器。最佳的方式证明热转换器是从所有生产缺陷解脱要求制造商压力检测。如果那不是可能的,在车间被推荐检查它消灭所有可能的惊奇,当测试可能延迟项目进度的系统时。
  • 匿名
2013-05-23 12:24:58
热转换器建筑是非常重要和关键的。 出口阀通常安装在意味着机器的上面大相当数量空气将审阅热转换器。 最佳的方式证明热转换器是从所有生产缺陷解脱要求制造商压力检测。 如果那不是可能的,推荐它检查它在车间消灭所有可能的惊奇,当测试可能延迟项目日程表的系统时。
  • 匿名
2013-05-23 12:26:38
换热器施工是非常重要和关键。出口阀通常安装在顶部的手段大量的空气会通过热交换器的机器。最好的证明换热器是免费从任何制造缺陷的压力测试要求制造商。如果那是不可能的它被建议将其签入的讲习班,以消除任何可能的惊喜,测试系统可能会延迟项目日程时。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭