当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to the head shape of a high-speed train, 162 control points are set up on the surface of the train head, which are used to build 12 B-spline curves. Then, the 12 B-spline curves can be used to build seven B-spline surfaces. After that, the left half of the train head is established, as shown in Fig. 2. To fac是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the head shape of a high-speed train, 162 control points are set up on the surface of the train head, which are used to build 12 B-spline curves. Then, the 12 B-spline curves can be used to build seven B-spline surfaces. After that, the left half of the train head is established, as shown in Fig. 2. To fac
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
根据高速火车的顶头形状, 162个控制点被设定火车头的表面上,用于修造12 B多槽轴曲线。然后, 12 B多槽轴曲线可以用于建立七B多槽轴表面。如图2.所显示,在那以后,火车头的左一半建立。要促进最新分析, B多槽轴曲线被编号C1对C12,分别。
  • 匿名
2013-05-23 12:24:58
根据高速火车的顶头形状, 162个控制点在火车头的表面被设定,用于修造12 B多槽轴曲线。 然后, 12 B多槽轴曲线可以用于建立七B多槽轴表面。 在那以后,火车头的左一半建立,如所显示。 2. 要促进最新分析, B多槽轴曲线被编号C1对C12,分别。
  • 匿名
2013-05-23 12:26:38
高速列车的头部形状,162 控制点设置的列车头,用于生成 12 B 样条曲线的表面。然后,12 B-样条曲线可以用于建立七个 B 样条曲面。之后,列车头部左半部分建立,如图 2 所示。为了方便以后的分析,B-样条曲线编号 C12,C1 分别。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭