当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:There is a pile of n wooden sticks. The length and weight of each stick are known in advance. The sticks are to be processed by a woodworking machine in one by one fashion. It needs some time, called setup time, for the machine to prepare processing a stick. The setup times are associated with cleaning operations and c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
There is a pile of n wooden sticks. The length and weight of each stick are known in advance. The sticks are to be processed by a woodworking machine in one by one fashion. It needs some time, called setup time, for the machine to prepare processing a stick. The setup times are associated with cleaning operations and c
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
有堆n木棍子。长度和重量每根棍子事先知道。棍子将由木材加工机器逐个处理以时尚。它需要不少时刻,呼叫设置时间的机器准备处理棍子。设定时间同清洁工作和改变工具和形状联系在一起在机器。给木材加工机器的设定时间如下:
  • 匿名
2013-05-23 12:24:58
有堆n木棍子。 长度和重量每根棍子事先知道。 棍子将由木材加工机器逐个处理以时尚。 它需要某个时候,呼叫建立时间,为机器准备处理棍子。 设定时间在机器同清洁操作和改变工具和形状联系在一起。 测量木材加工机器的设定时间如下:
  • 匿名
2013-05-23 12:26:38
有一堆的 n 木棍。长度和重量每个棍子的预先知道的。棍子是由在一个由一个时尚的木工机进行处理。它需要一段时间,称为设置时间、 机准备加工一根棍子。安装时间都是与清洗行动和不断变化的工具和机器中的形状相关联的。木工机器的安装时间如下所示:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭