当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the lead time used for calculation shall be the greater of the time to repair and the time to replace. The calculation of quantities shall also be consistent with the maintenance and spare parts and consumables holding philosophy (including a statement of the probability of a stock outage used in the calculation), any 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the lead time used for calculation shall be the greater of the time to repair and the time to replace. The calculation of quantities shall also be consistent with the maintenance and spare parts and consumables holding philosophy (including a statement of the probability of a stock outage used in the calculation), any
问题补充:

  • 匿名
2013-05-23 12:21:38
用于计算的交货时间应为当时的更大的修复和更换时间。量的计算也应与维修及备件和消耗品控股哲学(包括在计算中使用的股票停运的概率表),由承办商的零部件的种类和使用任何特定的经验和一致耗材和可更换单元1号线维修的识别和选择。
  • 匿名
2013-05-23 12:23:18
用于演算的前置时间将是伟大的时候修理和时候替换。数量的演算也与举行哲学的维护将是一致的和备件和消费品(储蓄储运损耗的可能性的包括声明用于演算的),所有特殊对备件的经验由类型的承包商和用途和消费品和线第1条线的维护可替换的单位的证明和选择。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
用于计算的时间应更多的时间进行修理和更换时间。计算量也应符合维修、 零件和承建商的类型和使用备件和消耗品和识别和选择线更换的单元的第 1 行维修耗材举行哲学 (包括语句的概率的计算中使用股票停机),任何特定经验。
  • 匿名
2013-05-23 12:28:18
使用的时间的计算方法应是更多的时间进行修理和更换。 数量的计算也应符合维护和备件和耗材控股理念[包括一项声明的可能性的一个库存中断在计算中使用],任何特定经验的承包商的类型和使用的备件和耗材和识别和选择的行的可更换单元1行维护。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭