当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:I met with Jesper yesterday and discussed our interest to do a 2-3 day LEAN dive on the layout, flow, manning, TAKT capacity verification for this new line. Objective being to surface some efficiency ideas that make sense to incorporate into the line BEFORE it hits the floor, and BEFORE we hire anyone (ideally we don’是什么意思?

待解决 悬赏分:1 - 离问题结束还有
I met with Jesper yesterday and discussed our interest to do a 2-3 day LEAN dive on the layout, flow, manning, TAKT capacity verification for this new line. Objective being to surface some efficiency ideas that make sense to incorporate into the line BEFORE it hits the floor, and BEFORE we hire anyone (ideally we don’
问题补充:

  • 匿名
2013-05-23 12:21:38
我昨天会见了加斯帕和讨论我们的利益做了2-3天瘦潜水的布局,流程,人员配备,生产节拍的能力验证这个新的生产线。目的是表面的一些效率的想法,是有意义的纳入行撒在地板上之前,我们雇用任何人之前(理想情况下,我们没有雇用)。 EDK支持这种积极的态度,这条线(不EnerDel的线 - 它应该只安装了轮子后,方便移动)。
  • 匿名
2013-05-23 12:23:18
我昨天会见杰斯珀并且谈论了我们的兴趣做在布局的2-3天精瘦的下潜,流动,供以人员, TAKT这条新的线的容量证明。客观将浮出水面有道理合并到线里的一些效率想法,在它击中地板前,并且,在我们聘用任何人前(理想地说我们不必须聘用)。EdK支持这条线的(不是Enerdel线这个主动方法–它应该只安排轮子被安装后促进容易的运动)。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
我昨天会见 Jesper 和讨论了我们的利益要做 2-3 日精益潜水的布局,流,曼宁,节拍能力核查此新行。客观是有些道理的将纳入线它击中地板,和之前我们雇用任何人的效率想法浮出水面 (理想的情况是我们不需要雇用)。EdK 支持这种积极主动的做法,这条线 (不是亚洲线 — — 它应该只有车轮安装以后方便容易运动)。
  • 匿名
2013-05-23 12:28:18
我会见了“昨天,讨论了我们的利益,做一个2天的精益潜水的布局、流程、人员配备、节拍能力核查这一新行。 目的是在表面上一些效率意识理念,融入到它的前一行楼层的点击次数,并在我们聘请[理想的情况是,我们没有去找]。 EDK支持这种积极的办法,此行[未enerdel行-它应该只有安装的车轮,方便运动]。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭