求翻译:In each calendar year, by the end of August of Year 0 (current year), the Generator Facility shall provide SESB (as the GSO) with a provisional generator maintenance schedule, which covers Year 1 on a daily basis. The provisional plan for Periodic Tests, which may incorporate several tests, shal1 be indicated in the Ye是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In each calendar year, by the end of August of Year 0 (current year), the Generator Facility shall provide SESB (as the GSO) with a provisional generator maintenance schedule, which covers Year 1 on a daily basis. The provisional plan for Periodic Tests, which may incorporate several tests, shal1 be indicated in the Ye
问题补充:

  • 匿名
2013-05-23 12:21:38
在每个日历年度,由0年(本年)的八月底,发电机设备应提供SESB(作为GSO)用临时发电机的维护计划,涵盖1年,每天。定期测试的临时计划,其中可能包括一些测试,shal1来表示在今年1发电机维修方案B。)发电机设施应inforrn他们准备的GSO进行定期测试,并应当提交拟议时间表定期测试测试所要求的日期前至少90天的GSO调度目的,
  • 匿名
2013-05-23 12:23:18
在每个历年,在8月年以前0 (本年度),发电器设施将提供SESB (作为GSO)以一张临时发电器维护日程表,每天包括年1。
  • 匿名
2013-05-23 12:24:58
在毎历年,在8月年0 (本年度以前),发电器设施将提供SESB (,因为GSO) 以一张临时发电器维护日程表,每天报道年1。 临时计划为周期性测试,也许合并几个测试, shal1在年1发电器维护日程表b.被表明。) 发电器设施inforrn他们的准备GSO将进行周期性测试,并且为周期性测试递交提出的日程表为预定的目的由GSO至少90天在测试之前请求的日期
  • 匿名
2013-05-23 12:26:38
在每个日历年中由 0 (当前年),一 8 年月底发电机设施应提供电力局 (GSO) 作为临时发电机维护日程安排,其中包括 1 年在日常基础上。定期进行测试,这可能包括几个测试的临时计划 1 年发电机维修附表 b 中注明 shal1.)发电机设施须 inforrn 地球同步轨道,他们愿意进行定期测试,并应提交定期测试调度目的的地球同步轨道的测试要求日期前至少 90 天的拟议的时间表
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 