当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall take all reasonable steps to ensure that the Works are coordinated and integrated with the works of all other parties in an orderly and timely manner. The Contractor shall cooperate with Designated Contractor as instructed by the Employer or the Employer\'s Representative, and shall in particular:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall take all reasonable steps to ensure that the Works are coordinated and integrated with the works of all other parties in an orderly and timely manner. The Contractor shall cooperate with Designated Contractor as instructed by the Employer or the Employer\'s Representative, and shall in particular:
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商应采取一切合理步骤,以确保工程的协调和整合有序,及时地所有其他各方的工作。该承建商须与指定承办商合作的指示,由用人单位或雇主\的代表性,并应特别:
  • 匿名
2013-05-23 12:23:18
承包商将采取所有合理的步骤保证工作协调并且集成与其他党工作以井然和实时性方式。承包商与选定的承包商将合作如指示的是由雇主或雇主\\ ‘s代表,并且特别是将:
  • 匿名
2013-05-23 12:24:58
承包商将采取所有合理的步骤保证工作协调并且集成与其他党工作以井然和实时性方式。 承包商与选定的承包商将合作如是由雇主或雇主\ ‘s代表指示的,并且特别是将:
  • 匿名
2013-05-23 12:26:38
承包者应采取所有合理步骤,确保该工程得到协调,并及时有序地与所有其他缔约方的作品集成。承建商应指定承建商合作,作为指示由雇主或 Employer\ 的代表,并应特别是:
  • 匿名
2013-05-23 12:28:18
承包者应采取一切合理步骤,以确保工程协调一致和综合的工程,与所有其他各方在一个有秩序和及时的方式。 承包者应与指定承建商合作说明,雇主或雇主的代表,尤应:
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭