求翻译:本标段为龙陵高速第C06合同段,起点桩号K26+100,终点桩号K29+130,全长3.03公里。主要工程内容为路基、桥梁、隧道工程施工。其中大桥3座,为坝田河1号大桥(左幅156.08米,右幅213米),坝田河2号大桥(左幅396.08米,右幅276米),下平河大桥(左幅126.08米,右幅126.08米),均为后张法T型连续梁施工。涵洞1处,通道3处。隧道3座,其中茅草坪2号隧道左右幅单洞累计620米,茅草坪3号隧道左右幅单洞累计1935米,南天门1号隧道左右幅单洞累计1520米。针对本工程特点,采取如下施工方法:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本标段为龙陵高速第C06合同段,起点桩号K26+100,终点桩号K29+130,全长3.03公里。主要工程内容为路基、桥梁、隧道工程施工。其中大桥3座,为坝田河1号大桥(左幅156.08米,右幅213米),坝田河2号大桥(左幅396.08米,右幅276米),下平河大桥(左幅126.08米,右幅126.08米),均为后张法T型连续梁施工。涵洞1处,通道3处。隧道3座,其中茅草坪2号隧道左右幅单洞累计620米,茅草坪3号隧道左右幅单洞累计1935米,南天门1号隧道左右幅单洞累计1520米。针对本工程特点,采取如下施工方法:
问题补充:

  • 匿名
2013-05-23 12:21:38
The tenders for the contract segment C06 Longling high-speed section, starting Stake K26 +100, end Stake K29 +130, total length of 3.03 km. Main content of the works for the roadbed, bridges, tunnels construction. One bridge 3, the dam Tin River No. 1 Bridge (left pieces of 156.08 m, right hand side
  • 匿名
2013-05-23 12:23:18
The tenders for high-speed the C lung mausoleum paragraph 06 contracts, starting 26 + 100 K piles of piles, and finish with a total length of 3.03 K 29 + 130 kilometers. Main content of the works, bridges, tunnels for roadbed construction works. Block 3, for which the bridge, as well as Tin River Br
  • 匿名
2013-05-23 12:24:58
This sign Duan Weilong mausoleum high speed C06 contract section, beginning station number K26+100, end point station number K29+130, span 3.03 kilometers.Main project content for roadbed, bridge, tunneling construction.Bridge 3, for the dam field river 1 bridge (left 156.08 meters, right 213 meters
  • 匿名
2013-05-23 12:26:38
C06 contract section of this section of the longling high speed, K26+100, starting point, end point, K29+130, 3.03 km. Main engineering, bridge, tunnel construction for subgrade. Bridge block 3, dam situated, 1th (left site of 156.08 metres, right off 213 m) Dam situated, 2nd (left 396.08 metre, rig
  • 匿名
2013-05-23 12:28:18
This sign Duan Weilong mausoleum high speed C06 contract section, beginning station number K26+100, end point station number K29+130, span 3.03 kilometers.Main project content for roadbed, bridge, tunneling construction.Bridge 3, for the dam field river 1 bridge (left 156.08 meters, right 213 meters
 
 