求翻译:The monitoring process of the external prestressing tendons construction includes inspecting the cracks in the diaphragm anchorage and the deviation block devices before the tension forces are applied to the external tendons; measuring the deformation of the steel deviation cross beam during the tension process; measur是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The monitoring process of the external prestressing tendons construction includes inspecting the cracks in the diaphragm anchorage and the deviation block devices before the tension forces are applied to the external tendons; measuring the deformation of the steel deviation cross beam during the tension process; measur
问题补充:

  • 匿名
2013-05-23 12:21:38
体外预应力筋施工监控过程包括检查隔膜锚地的裂纹和偏差块设备的张力被应用到外部筋之前,张力过程中测量偏差钢横梁的变形,测量变形不同级别的拉力后,箱梁的应用,测量张力的每个级别的体外预应力筋的伸长率,并测量体外预应力筋的固有频率后的紧张过程就完成了。
  • 匿名
2013-05-23 12:23:18
这, 那; 这些, 那些
  • 匿名
2013-05-23 12:24:58
在紧张力量被应用于外在腱之前,外在预加应力的腱建筑的监视过程在膜片定住和偏差块设备包括检查镇压; 测量钢偏差横梁的变形在紧张过程期间; 测量梁木箱的变形在紧张力量以后的不同的水平是应用的; 测量外在腱的伸长在紧张的每个水平; 并且测量外在腱的固有频率在紧张过程以后是完全的。
  • 匿名
2013-05-23 12:26:38
外部预应力筋施工监测过程包括检查隔膜锚固和偏差块设备中的裂缝之前紧张部队应用于外部筋 ;钢偏差的变形测量过程中的紧张 ; 横梁箱形梁的变形测量后应用不同级别的张力部队 ;测量每个级别的张力 ; 体外预应力钢束伸长率和测量固有频率的外部肌腱紧张过程完成之后。
  • 匿名
2013-05-23 12:28:18
外部给人预加应力腱的监测过程建造包括在隔膜停泊地点和偏离街区设备检查裂缝紧张军队被应用到外部腱之前;在紧张过程期间测量钢铁偏离十字形横梁的变形;在不同水平的紧张军队之后测量盒的梁的变形被应用;以紧张的每种程度为单位测量外部腱的延伸;以及在紧张过程之后测量外部腱的自然频率是完整的。
 
 