求翻译:隧道洞身采用无轨运输,采用装载机装碴,大型自卸汽车运输。当装渣机械不能到达的地段,可采用人工装斗车运输的方式施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
隧道洞身采用无轨运输,采用装载机装碴,大型自卸汽车运输。当装渣机械不能到达的地段,可采用人工装斗车运输的方式施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Tunnel hole-free rail transport the body, using the loader mounted ballast, large dump truck transportation. When mechanical equipment can not reach the dregs of the lot, can be manually loaded dump trucks transport the way construction.
  • 匿名
2013-05-23 12:23:18
Tunnel-dong, who used a no-rail transit loaders, large-scale has been fitted with agressive motor transport. When fitted with Standard Chartered mechanical not accessible to the application of artificial loaded dump truck lot, can transport the methods of construction.
  • 匿名
2013-05-23 12:24:58
The tunnel hole body uses the flexible transport, uses the car loader attire to be cut by broken glass, large-scale dump truck transportation.When installs the land sector which the dregs machinery cannot arrive, may use the artificial attire mine trolley transportation the way construction.
  • 匿名
2013-05-23 12:26:38
Tunnel transport trolley, the use of loader loading ballast, a large dump truck transport. When lot packed slag machinery cannot reach, to be used hand-mounted mounted lorries transport construction.
  • 匿名
2013-05-23 12:28:18
The tunnel hole body uses the flexible transport, uses the car loader attire to be cut by broken glass, large-scale dump truck transportation.When installs the land sector which the dregs machinery cannot arrive, may use the artificial attire mine trolley transportation the way construction.
 
 