当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:隧道Ⅴ,Ⅳ地段导洞超前锚杆采用长350cm的D25中空注浆锚杆,环向间距50cm,纵向间距200cm。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
隧道Ⅴ,Ⅳ地段导洞超前锚杆采用长350cm的D25中空注浆锚杆,环向间距50cm,纵向间距200cm。
问题补充:

  • 匿名
2013-05-23 12:21:38
Tunnel Ⅴ, Ⅳ lots bolt guide holes ahead of the D25 with a long hollow grouting anchor 350cm, circumferential spacing 50cm, the vertical spacing of 200cm.
  • 匿名
2013-05-23 12:23:18
Tunnel V ABM-dong, IV lots ahead 350 cm long shank used in 25 hollow note pulp D shank, Central distance between the vertical distance between 50 cm, 200 cm .
  • 匿名
2013-05-23 12:24:58
TunnelⅤ,ⅣThe land sector guide hole anchor rod uses in long 350cm in advance D25 the spatial note thick liquid anchor rod, the link to spacing 50cm, longitudinal spacing 200cm.
  • 匿名
2013-05-23 12:26:38
V tunnel, long drift leading anchor ⅳ lots D25 hollow of 350cm Grouting anchors, circumferential 50cm interval, 200cm vertical spacing.
  • 匿名
2013-05-23 12:28:18
TunnelⅤ,ⅣThe land sector guide hole anchor rod uses in long 350cm in advance D25 the spatial note thick liquid anchor rod, the link to spacing 50cm, longitudinal spacing 200cm.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭