求翻译:1、施工步骤:①上弧形导坑开挖○Ⅰ拱部初期支护 ②中核心开挖 ③下部开挖○Ⅱ○Ⅲ边墙及仰拱初期支护是什么意思? 待解决
悬赏分:1
- 离问题结束还有
1、施工步骤:①上弧形导坑开挖○Ⅰ拱部初期支护 ②中核心开挖 ③下部开挖○Ⅱ○Ⅲ边墙及仰拱初期支护
问题补充: |
|
2013-05-23 12:21:38
1, the construction steps: ① guide hole on the curved arch excavation ○ Ⅰ initial support ② ③ in the lower part of the core excavation excavation ○ Ⅱ ○ Ⅲ side walls and invert initial support
|
|
2013-05-23 12:23:18
Step 1: ( 1) in the curves and construction Hsuehshan I dig 0 arcade early Ministry support care 2 in 3 core digging digging Department under 0 0 II III wall and looked up the initial support care
|
|
2013-05-23 12:24:58
1st, construction steps:①On the arc guiding hole excavates ○ⅠArches the initial period supports and protections ②The core excavates ③Lower part excavates ○Ⅱ○ⅢThe frontier wall and inverts the initial period supports and protections
|
|
2013-05-23 12:26:38
1, construction steps: arcs 0 drift excavation on ① ⅰ arch core excavation in the primary supporting ② ③ excavation 0 0 ⅱ-ⅲ in the lower wall of invert early support
|
|
2013-05-23 12:28:18
1st, construction steps:①On the arc guiding hole excavates ○ⅠArches the initial period supports and protections ②The core excavates ③Lower part excavates ○Ⅱ○ⅢThe frontier wall and inverts the initial period supports and protections
|