当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This paper investigates the cost implications of contractual incompleteness and itse ect on subcontracting decisions in the bridge construction industry. Construction contracts are incomplete because the original blueprints and specications may require modications during construction. According to the transactions cost是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This paper investigates the cost implications of contractual incompleteness and itse ect on subcontracting decisions in the bridge construction industry. Construction contracts are incomplete because the original blueprints and specications may require modications during construction. According to the transactions cost
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
本文调查契约残缺不全和itse ect的费用涵义在转包决定的在桥梁建筑产业。因为原物图纸和specications也许在建筑时,要求modications建筑合同是残缺不全的。根据rm的交易成本理论|Coase (1937),威廉森(1985)|这样合同修正可能导致signicant讲价和重新谈判费用。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
该文件调查所涉的成本合同的不完全性和 itse ect 对分包的桥梁建造业的决定。建筑合同是不完整的因为原始的蓝图和规格可能在施工期间需要 modications。根据交易成本理论的 rm|科斯 (1937),威廉姆森 (1985 年),合同修订可以导致 signicant 的讨价还价和重新谈判成本。此外,理论预言这些费用在更大如果分包商执行工作。向前看承建商预期这些费用,并将其纳入他们的出价。我制定量化残缺不全的综合和非综合交易成本的影响,并将它应用于 32 桥梁合约采购的运输加州疾的实证架构。合同包含多个工作项 (例如现浇钢筋混凝土、 钻孔、 trac 的条带化)。对于每个项,承建商决定是
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭