当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据广西岑兴高速公路五合同段挖方路段地质情况和实践经验,详细介绍了CBR值未达到规定要求等挖方段路基所采取的浅层置换、掺拌水泥法等不同处理措施,以及效果分析是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据广西岑兴高速公路五合同段挖方路段地质情况和实践经验,详细介绍了CBR值未达到规定要求等挖方段路基所采取的浅层置换、掺拌水泥法等不同处理措施,以及效果分析
问题补充:

  • 匿名
2013-05-23 12:21:38
According to Xing Guangxi Cen excavation contract section of the highway five sections of geological conditions and practices, details the CBR value does not meet requirements such as roadbed excavation taken shallow replacement, mixed with cement mixed with different measures to deal with law and e
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Is popular the highway five contract section earth or stone excavated road section geology situation and the experience according to Guangxi Cen, introduced in detail the CBR value had not achieved earth or stone excavated section roadbeds and so on stipulation request adopt the shallow layer replac
  • 匿名
2013-05-23 12:26:38
According to Cen Xing, Guangxi Highway five contract period excavated sections of ground conditions, and practical experience, details the CBR value does not meet the requirements and other taken shallow excavated roadbed cement with replacement, mixed by different treatments, such as measures and e
  • 匿名
2013-05-23 12:28:18
Is popular the highway five contract section earth or stone excavated road section geology situation and the experience according to Guangxi Cen, introduced in detail the CBR value had not achieved earth or stone excavated section roadbeds and so on stipulation request adopt the shallow layer replac
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭