当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Pressurize the lower (high pressure) seal to approximately 5 psi to verify that the transmitter’s diaphragm is working properly. You should see the level increase with pressure. NOTE: Make sure that the upper seal is vented to atmosphere during this test是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Pressurize the lower (high pressure) seal to approximately 5 psi to verify that the transmitter’s diaphragm is working properly. You should see the level increase with pressure. NOTE: Make sure that the upper seal is vented to atmosphere during this test
问题补充:

  • 匿名
2013-05-23 12:21:38
加压下(高压)密封,以约5磅,以验证发射器的膜片是否正常工作。你应该看到的水平增加与压力。注意:请确保上部密封件在测试过程中排放到大气中
  • 匿名
2013-05-23 12:23:18
加压更低的(高压)封印对大约5 psi核实发射机的膜片适当地运作。您应该看到平实增量有压力。注:切记在这个测试期间,上部封印被放气对大气
  • 匿名
2013-05-23 12:24:58
加压更低的 (高压) 封印到大约5 psi核实发射机的膜片适当地运作。 您应该看平实增量以压力。 注: 切记上部封印被放气对大气在这个测试期间
  • 匿名
2013-05-23 12:26:38
加压低 (高压力) 密封到大约 5 psi,确认发射器的隔膜正常工作。您应该看到与压力级别提升。注意: 请确保在此测试期间的排放到大气层上部密封
  • 匿名
2013-05-23 12:28:18
增压降低 ( 强制 ) 封条到大约 5 psi 验证传送者的隔膜正确工作。你怀着压迫感应该看到程度的增长。注意:确保上的印章在这次测试期间到气氛被排放
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭