当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工现场主要运输道路路基碾压坚实,做好硬化处理并满足排水要求,保证雨后正常交通。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工现场主要运输道路路基碾压坚实,做好硬化处理并满足排水要求,保证雨后正常交通。
问题补充:

  • 匿名
2013-05-23 12:21:38
Major transport road embankment construction site rolled solid, well hardened and meet the drainage requirements of rain to ensure the normal traffic.
  • 匿名
2013-05-23 12:23:18
Roadbed construction site major transport routes crushing hardened solid, do a good job handling drainage requirements and to meet after the rain, and ensure normal traffic.
  • 匿名
2013-05-23 12:24:58
The job location main export-road roadbed roller compaction is solid, completes the carburizing and satisfies the draining water request, after the guarantee rain the normal transportation.
  • 匿名
2013-05-23 12:26:38
Construction site of major transport roadbed compacted solid, hardened and meet water requirements, guarantee normal traffic after the rain.
  • 匿名
2013-05-23 12:28:18
The job location main export-road roadbed roller compaction is solid, completes the carburizing and satisfies the draining water request, after the guarantee rain the normal transportation.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭