求翻译:Lastly, 37.1% of the projects, whose duration was below 6 months, were found to have RM implementation, while 45.6% of those lasting 6 to 14 months adopted RM. However, the percentage reached 67.3% in the projects lasting more than 14 months. This implied that RM implementation in small projects lasting less than 14 mo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Lastly, 37.1% of the projects, whose duration was below 6 months, were found to have RM implementation, while 45.6% of those lasting 6 to 14 months adopted RM. However, the percentage reached 67.3% in the projects lasting more than 14 months. This implied that RM implementation in small projects lasting less than 14 mo
问题补充:

  • 匿名
2013-05-23 12:21:38
最后,37.1%的项目,其持续时间为6个月以下,被发现有RM执行,而那些持续6至14个月的45.6%,采用RM。然而,百分率达到67.3%持续14个月以上的项目中。这暗示RM持续时间不超过14个月的小项目实施是不够的,而且持续时间较长的项目,更容易实现RM。这个结果呼应格里菲斯和HEADLEY的(1998)透露,这是不经济的管理小型项目由于项目的持续时间和所花费的时间RM之间的比例失调。因此,资源投入不足将RM实施的一个主要障碍。下一节标识RM实施小项目的关键障碍。
  • 匿名
2013-05-23 12:23:18
最后, 37.1%项目,期间是在6个月以下,发现有RM实施,而45.6%那些持续的6个到14个月采取了RM。然而,百分比到达了67.3%在持续超过14个月的项目。这暗示在持续少于14个月的小项目的RM实施是不充分的,并且与更长的期间的项目是可能实施RM。
  • 匿名
2013-05-23 12:24:58
最后, 37.1%项目,期间是在6个月以下,被发现有RM实施,而45.6%那些持续的6个到14个月采取了RM。 然而,百分比到达了67.3%在持续超过14个月的项目。 这暗示RM实施在持续少于14个月的小项目是不充分的,并且项目以更长的期间是可能实施RM。 这个结果随声附和了格里菲斯和Headley (1998年) 谁显露处理小项目由于不相当在RM上和时间之间花费的项目期间是不经济的。 因此,不充分的资源投资是一个主要障碍到RM实施。 下个部分在小项目辨认重要障碍到RM实施。