当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A few decades ago, earth dams which were only used for relatively small reservoirs, were considered unsuitable for high head development, but with the recent advances in soil mechanics and construction methods, earth dams are being built to a height of several hundred feet, and these dams are now considered as safe as 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A few decades ago, earth dams which were only used for relatively small reservoirs, were considered unsuitable for high head development, but with the recent advances in soil mechanics and construction methods, earth dams are being built to a height of several hundred feet, and these dams are now considered as safe as
问题补充:

  • 匿名
2013-05-23 12:21:38
前的几十年里,只用于为相对小型水库,土坝被认为是不适合高扬程的发展,但与土力学的最新研究进展和施工方法,正在兴建土坝几百英尺的高度,并这些水坝,现在被认为是安全的任何其他类型的大坝。
  • 匿名
2013-05-23 12:23:18
在几十年前,地球水坝,它们只用于相对较小水库、被认为不适合高头发展,但最近取得的进展在土壤力学和建筑方法,地球正在构建水坝,一个高度的几百英尺,而这些水坝现在被认为是安全的任何其他类型的拦水坝。
  • 匿名
2013-05-23 12:24:58
几十年前,为相对地小水库只使用的土坝,被认为不合适为高顶头发展,但与最近前进在土壤机械工和建筑方法,土坝被建造到高度几百只脚,并且这些水坝现在被认为一样安全象水坝的其他类型。
  • 匿名
2013-05-23 12:26:38
几十年前,仅用于相对较小型水库土坝被认为不适合高头发展,但与土壤力学和施工方法的最新进展,地球水坝正在兴建几个几百英尺的高度,这些大坝现考虑像任何其他类型的水坝一样安全。
  • 匿名
2013-05-23 12:28:18
几十年以前,地球仅用于相对小水库的障碍,为高头发展被认为是不相称,但是利用最近的进展在土壤力学和建造方法中,地球障碍被在建造到高度几百脚,这些障碍现在像障碍的任何其它类型一样安全被考虑。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭